Electrician MarketersGrowth for electrical contractors
Guide

Pricing electrical work in public

Why putting a starting figure on the website brings better calls, and how to word the number so it survives the surprises.

By Ali Sedighi3 minute readReviewed November 2026

Ask an electrical contractor whether prices belong on the website and the answer arrives fast, usually with a story about a customer who wanted a panel change for the price of a switch. The story is real. The conclusion drawn from it is usually wrong. Publishing a number, written carefully, filters more bad calls than it invites. The question is not whether to publish, but what exactly to publish, and what the page says will change the figure.

Start with what a number can honestly cover. A diagnostic visit, a permit application, a fixture swap in a room with an existing box: these are bounded jobs with a predictable range. A rewire of a 1948 house with knob-and-tube in the walls is not, and no honest page should pretend otherwise. Split the list into bounded work with a published starting figure and investigative work with a stated visit fee and a written quote after the visit. That split is the whole trick, and it takes an afternoon with the last year of invoices to make.

Write the number with its conditions attached. A panel upgrade from a stated figure assumes an accessible service, a short run, an existing meter base in reasonable condition and a permit at the standard fee. List the assumptions in a short block under the price, then say plainly what changes it: a jammed panel, asbestos in the wall, a service that has to be relocated, a strata that wants the work done after hours. A price without conditions is a promise you did not mean to make.

Publish the visit or diagnostic fee and explain the credit. A stated fee stops the free-quote treadmill for good and tells the customer that expertise has a price. Saying the fee is credited against the work if it proceeds is a fair and common arrangement, and it makes the number easier to say on the phone. The same principle applies to after-hours calls, which should carry their own rate printed on the page rather than a surprise on the invoice.

Then watch what the page does. Track the calls that arrive from priced pages against the ones from quote-request pages and compare how far each gets into the process. A published number usually produces fewer calls and better ones, and the difference shows up in the quote-to-win rate within a couple of months. If it does not, the number is probably wrong rather than the idea. Price pages are a hypothesis as much as a statement, and they are cheap to adjust when the evidence arrives.

Checklist

  • List the ten jobs that most often turn into invoices.
  • Sort them into bounded work and investigative work.
  • Write the assumptions under each starting figure.
  • Print the diagnostic fee and say whether it is credited.
  • Review the called-in jobs after eight weeks.

Print it or send it to the person who answers the phone.

Questions this raises

Will publishing prices not just train customers to shop on price?

It does the opposite when the conditions are printed. A shopper comparing three vague pages learns nothing; a shopper comparing a page with assumptions, a permit line and a diagnostic fee learns what the work involves, and the cheapest guess usually looks thinner.

What if a competitor quotes much lower?

Write down what the lower number tends to exclude, then say those things on the page without naming anyone. Permits, inspection, disposal, drywall repair and after-hours work are the usual omissions, and a customer who has read the list can ask about them.

Written and reviewed by Ali Sedighi. Published prices, a written scope and one monthly readout. Consulting by Sedighi.ca.

Tell us what the calendar should look like next quarter.

Call (604) 632-4959TextEmail
CallTextEmail
^